For Better Performance Please Use Chrome or Firefox Web Browser

Research Projects

  1. Cooperation in designing and building the first Remotely Operated Vehicle (ROV) in the country - Kavosh I (first rank of  Kharazmi Festival).
  2. Cooperation in designing an underwater robot for exploration – Kavosh II.
  3. Collaboration in designing and construction of  meteorological Buoy plant – Baraab I.
  4. Cooperation in equipping of  Hydro-aerodynamic laboratory.
  5. Cooperation in the design and construction of  the Remotely Operated Vehicle (ROV)- Kavosh III to inspect oil pipes and platforms.
  6. Cooperation in the core of flight simulators, 1995.
  7. Cooperation with Electro-filler Group - Isfahan Science and Technology Town (ISTT), 1996.
  8. Cooperation in designing and construction data acquisition systems for auto parts testing devices , 1997.
  9. Project Manager Design and construction of data acquisition systems for cementing equipment of oil wells.
  10. Cooperation in the design and construction of  Remotely Operated Vehicle (ROV)-Kavosh 4 and the head of the test department "Design and construction of underwater robot for special applications"
  11. Cooperation in the design, installation and commissioning and training of equipment for Oceanic Buoys applied for measuring oceanographical and meterological parameters, 1996-2002.
  12. Project manager of optimization equipment plan for three wave  measurment buoys and other measuring devices, 2003-2007.
  13. Project Manager of Execution, Reconstruction and Upgrading of Caspian Oil Company Floating Oceanographic buoy System,2005- 2007.
  14. Project Manager of the installation and commissioning of buoys of the Norwegian company Oceanor in Iran, 2005-2007.
  15. Project Manager  of  Reconstruction Comex Deep Water Robot, 2007-2011.
  16. Collaboration in designing and building the "National Buoy Plan", 2010-2011.
  17. Cooperation in the design and construction of  Remotely Operated Vehicle (ROV)-Kavosh 8,2018-2021
  18. Cooperation in equipment supply and maintenance projects for meteorological and wave measurment buoys, 2017-2021

تحت نظارت وف ایرانی